Case study · Project Tracker

Project Tracker: Turning Manual Reporting Into Real-Time Stakeholder Tracking

Built for the Cardiovascular Network of Canada (CANet), Operations Centre.

Fabian Folias2 min read
Overview

ClientCardiovascular Network of Canada (CANet), Operations Centre

RoleLead designer and developer, responsible for UX/UI, platform architecture, and full front-end build

Timeline10 weeks

DeliverablesCustom national project tracking platform, stakeholder dashboard, standardized reporting system

Project Tracker is a national project management platform built for the CANet Operations Centre, giving research teams across Canada a single, centralized system to log patient enrollment, financial commitments, and expenditures across every CANet-funded project.

60+
CANet-funded sites on one reporting system
15–20
staff hours saved per reporting cycle
75+
clinical sites within 18 months, up from 60
10
weeks from kickoff to launch
Fabian Folias — Case Study - Project Tracker

The Problem

60+ sites, 60+ spreadsheets, two weeks to report.

Before Project Tracker, monitoring CANet-funded research was slow and fragmented. Each of the 60+ CANet-funded research sites tracked patient enrollment and spending in its own spreadsheet, using its own format. Ahead of national project meetings, Operations Centre staff had to manually collect, reconcile, and consolidate updates from every site, a process that took roughly 2 weeks per reporting cycle. By the time the compiled report reached stakeholders, some figures were already a month or more out of date.

That caused problems on multiple fronts:

  • For research teams, inconsistent reporting formats made it hard to compare progress against other sites, and there was no shared way to flag issues between meetings.
  • For the CANet Operations Centre, staff spent an estimated 15 to 20 hours per reporting cycle manually compiling spreadsheets from dozens of sites, often working from figures that were already outdated by the time meetings happened.

The Approach

One purpose-built platform, one way to report.

Rather than relying on generic project management software, I designed Project Tracker as a purpose-built platform tailored to CANet’s specific reporting needs, standardizing how every funded project tracks and shares progress.

Key decisions worth noting:

  • Made the platform mandatory across all 60+ funded projects, replacing inconsistent spreadsheet-based reporting with one standardized system.
  • Built a stakeholder dashboard so project status, enrollment, and spend could be reviewed live during national meetings, eliminating the manual pre-meeting compilation process.
  • Connected metric tracking directly into CANet’s organization-wide reporting, removing a separate manual roll-up step that used to take days.
What it does

Key features and functionality

  1. Project-Specific Tracking.Granular, real-time tracking of patient enrollment, financial commitments, and expenditures for every funded project.
  2. Intuitive Dashboard.A comprehensive overview of project status and key metrics, built for quick access by stakeholders at every level.
  3. National Project Meetings.Used live during project meetings to provide proactive status updates and flag potential issues early.
  4. Promotion of Research Involvement.Visibility into ongoing research encourages participation and engagement at clinical practice sites nationwide.
  5. Metric Tracking.Feeds directly into CANet’s organization-wide metric tracking, supporting data-driven decisions and strategic planning.
Results

What changed for the Cardiovascular Network of Canada (CANet).

  • Cut the national reporting cycle from roughly 2 weeks of manual compilation down to real-time, always-current data.
  • Brought all 60+ CANet-funded sites onto one standardized reporting system, replacing individually formatted spreadsheets.
  • Freed up an estimated 15 to 20 staff hours per reporting cycle previously spent manually reconciling site updates.
  • Increased participating clinical practice sites from 60 to 75+ within the first 18 months, following improved visibility into ongoing research.

“Project Tracker gave us, for the first time, a real-time national picture of every funded project. It’s changed how we run our project meetings and how we report to our funders.”

Natalie S., Director, Partnership and Knowledge Mobilization, CANet Operations Centre

CANet Project Tracker badge